MTO Selim Hill Bridge Repairs
Pierre Gagne Contracting was contracted to drill into the bedrock for foundations for the new Highway 17 bridge. The scope of work was to drill eight holes with a 40’ diameter and 4.5 m deep into bedrock.
Location:
Selim Hill, ON
Client:
LH North / MTO
Year:
2015
Duration:
3 months
Value:
$1,100,000.00
Market:
Transport Contracting