MTO Selim Hill Bridge Repairs

 

Pierre Gagne Contracting was contracted to drill into the bedrock for foundations for the new Highway 17 bridge. The scope of work was to drill eight holes with a 40’ diameter and 4.5 m deep into bedrock.

 

Location:
Selim Hill, ON

Client:
LH North / MTO

Year:
2015

Duration:
3 months

Value:
$1,100,000.00

Market:
Transport Contracting

Previous
Previous

MTO Rossport Bridge Repairs, 2016

Next
Next

Neebing-McIntyre Floodway Dredging, 2015